AfterTub to Shower Conversion Cost in Summerlin, NV: What the Slab Decides
Tub-to-shower conversion in Summerlin typically runs $3,500 to $10,000 for a straightforward swap, while a full bathroom remodel that includes the conversion lands between $9,000 and $28,000. The number that moves most is whether your tub drain can stay where it is. Most Summerlin production homes sit on slab-on-grade foundations, so relocating that drain means saw-cutting concrete, and that single step adds $800 to $1,500 plus 3 to 5 business days. Call (844) 797-4877 and we’ll tell you which side of that line your house is on before you commit to anything.
Key takeaways
- Base conversion: $3,500-$10,000. Whole-bath scope with the conversion: $9,000-$28,000.
- Slab drain relocation adds $800-$1,500 and a separate Clark County plumbing permit.
- Hidden greenboard behind a 1990s tub surround is common; we price that contingency in writing before demo.
- Every project gets a written price before work starts and the 365-Day Done Right Promise after.

Why the drain location is the first question you should ask
In The Trails, The Paseos, and most of the villages built through the 1990s and 2000s, the tub drain is cast into the concrete slab at a fixed point. A new shower pan wants its drain at the center or the end of a different footprint. Those two points rarely line up.
Closing the gap is real work. A crew saw-cuts the slab, trenches down to the ABS line, re-routes it, and patches the concrete. The trench has to be inspected before the patch is poured, and that inspection rides on a plumbing permit that is separate from your tile-and-finish permit. Then the patch has to cure before anyone thinks about waterproofing.
Which brings us to the question worth asking every contractor who quotes you: is the drain relocation inside the written price, or is it a time-and-material add-on billed after demo? We put it in the scope up front, in dollars, because a homeowner shouldn’t learn the real cost of a conversion on the day the concrete opens.
What demo day usually uncovers in a Summerlin tub alcove
Pulling a tub surround off a 1990s Summerlin alcove often reveals greenboard drywall that has been quietly absorbing moisture for decades. It looks fine from the tile side. From the back, it’s soft, stained, and holding nothing.
That substrate comes out. All of it. It gets replaced with cement backer board or a Schluter membrane system before a single tile goes down, because waterproofing over compromised board is how a shower fails in year three. Our written scope carries a named contingency line for exactly this situation and sets a fixed price for it before demo begins, so the discovery changes the schedule but not the number you agreed to.
Waterproofing and tile work of this kind sits squarely inside our Bathroom Remodeling scope, and it’s the part of the job where shortcuts show up fastest.

Tub to shower conversion pricing in Summerlin
Here’s how the line items break out for a Summerlin conversion. Ranges reflect what these projects actually cost here, slab and all.
| Line item | Cost range |
|---|---|
| Tub-to-shower conversion (standard, drain stays put) | $3,500-$10,000 |
| Walk-in shower installation | $4,500-$12,000 |
| Shower replacement (existing shower footprint) | $3,000-$8,500 |
| Slab saw-cut and drain relocation | $800-$1,500 |
| Full bathroom remodel including conversion | $9,000-$28,000 |
| Small bathroom remodel | $5,000-$12,000 |
| Bathroom vanity installation | $800-$3,000 |
Fixtures come from names you can look up yourself: Kohler, Moen, and Grohe. Their warranties travel with the finished project, which matters more in a wet room than almost anywhere else in the house.
Three local scenarios we see again and again
The Sun City Summerlin aging-in-place conversion
Sun City Summerlin is age-restricted, single-story, and full of homeowners stepping over a tub wall they no longer trust. A barrier-free conversion there usually adds three specific pieces: a Kohler grab-bar set, a fold-down shower seat, and a pressure-balanced anti-scald valve. Each has its own line in the written price, and none of them is an upsell we spring on you later.
The 1990s production-home alcove
Stucco-and-tile Mediterranean plans from the early villages were built fast and built to a price. The tub surround went up over greenboard, the drain was set where the plan said, and nobody expected the alcove to be opened thirty years later. We plan for the substrate replacement and the slab question together, because in these homes they tend to arrive on the same day.
The hillside village with design review
Summerlin is a 22,500-acre master-planned community, and in villages like Redpoint and Summerlin West, exterior changes pass through village-level design review and strict CC&Rs. A conversion that stays entirely inside the bathroom rarely triggers review. Add a window or move a wall and it can. We flag that early rather than after the permit submission.
Scheduling around heat and monsoon season
Many Summerlin showers use a mud-set pan, and that mortar bed needs a minimum 24-hour cure before tile begins. From July through September, afternoon monsoon humidity slows cure times, and summer heat above 100°F pushes every pour into the early morning.
We schedule morning-pour windows and stage covered cure areas so a humidity spike doesn’t push your tile timeline. A conversion that starts in June and one that starts in October follow different calendars, and we’d rather tell you that at the estimate than at the end.
What happens after the last tile is set
Tub-to-shower conversions are the project where we see the most year-one callbacks, and we know exactly where they cluster: caulk at the curb, grout at the niche, and compression on the door seal.
The 365-Day Done Right Promise covers all three for a full year after completion. You call, a live person answers, and we come back and make it right. Not a voicemail box, not a callback on Monday. Also on every job: shoe covers and drop cloths, quiet tools during nap and school hours where we can manage it, pet-safe products where there’s a choice, and a photo of the clean-up before the crew leaves.
Our technicians bring up to 21 years of experience, and every one of them is background-checked. For families with children and pets in the house, knowing who’s walking through the door isn’t a detail. It’s the whole decision. You can see how this fits the wider picture on our Bathroom Remodeling in Summerlin page, or start from our home page.
FAQs
A standard tub-to-shower conversion in Summerlin runs $3,500 to $10,000, and a full bathroom remodel that includes the conversion runs $9,000 to $28,000. If your drain needs to move, add $800 to $1,500 for the slab work. Call (844) 797-4877 for a written price on your specific bathroom – estimates are free.
Yes. Saw-cutting a slab to relocate a 2-inch drain line requires a Clark County plumbing permit separate from the tile-and-finish permit, and the trench must be inspected before the concrete patch is poured. Ask any contractor whether that permit and inspection are included in the quoted price or billed afterward. Call (844) 797-4877 and we’ll walk you through what your project needs.
Conversion usually costs more up front, but a tub surround that’s hiding failed greenboard rarely gets cheaper with time. A $3,500 to $10,000 conversion replaces the substrate, the waterproofing, and the drain path in one project. A repair patches one layer and leaves the rest. Call (844) 797-4877 for a free estimate on both paths so you can compare them side by side.
We schedule around morning-pour windows and cure times, so most conversions take a few extra business days when slab work is involved, and yes, you can stay home through it. Drop cloths and shoe covers go down at the start of every visit, and we ask before moving anything. Call (844) 797-4877 to get your dates on the calendar – the estimate is free and the price is written before any work starts.
Ready to know what your bathroom actually needs? Call Elmstead Remodeling Summerlin at (844) 797-4877 for a free estimate. You’ll get a written price before any work starts, a scope that names the slab question and the substrate contingency in dollars, and the 365-Day Done Right Promise behind the finished shower. A live person answers, any hour.
Written by the team at Elmstead Remodeling Summerlin, serving Summerlin, NV.
What Our Customers Say
"Redid our main bath. They protected the hallway and carpet the whole way to the bathroom and vacuumed daily. Quiet during the baby's naps when they could be. Lovely finish."
- Harold Nussbaum"Opened up our kitchen. They controlled the dust better than I thought possible, protected the floors, and left a photo of the cleaned space each day. Gentle on the house and on budget."
- Simon Albright"Kitchen remodel with two kids home. They walled it off in plastic and cleaned every day. Calm, respectful crew and the result is gorgeous."
- Priya Venkataraman